1. Determine the installation location: Select the center or high point of the pavilion top as the installation location to ensure that the lightning rod can cover the entire range of the pavilion.
2. Prepare installation materials: Purchase installation materials such as lightning rods, down conductors, grounding bodies, etc. that meet the specifications, and ensure that the material quality is reliable.
3. Install the lightning rod: Fix the lightning rod at the predetermined position on the top of the pavilion to ensure firmness and stability.
4. Connect the down conductor: Connect the down conductor to the bottom of the lightning rod and lead it underground along the pavilion pillar or wall.
5. Install the grounding body: Install the grounding body at an appropriate location underground, and reliably connect the down conductor to the grounding body to ensure that lightning can be discharged smoothly into the earth.
